National cost guides put two-story decks at $30 to $60 per square foot and raised decks at $25 to $50 (Fixr, updated January 11, 2023). Those are national figures, not Omaha quotes. Height drives the price, because each level you raise a deck adds support. In Omaha the job is also shaped by a 42-inch frost line and a 25 psf ground snow load (both from Omaha's amended code table, Ordinance 42104, notice dated 2020; labels read in the standard IRC order) and a 24-inch limit on beam cantilevers, all covered below with their sources. Permit status is in the permits section. Omaha Deck Builders is a referral service, not a deck company.
Send the quote form on this page or call. We get back to you within one business day and connect you with a local deck company, which does the work, not us. You pay Omaha Deck Builders nothing for either.
Calls reach a voicemail box. Leave your name, your town and a short description of the job.
What counts as a second story deck
This page is about decks that sit high off the ground. Fixr describes the two-story type as raised up to the second story on pillars and attached to the house, usually with concrete footings under the pillars. Three other terms come up for nearby jobs:
- Raised or elevated deck. Fixr prices it separately, a little lower than a full two-story deck.
- Walkout deck. Ask how the space under it is used (see the under-deck section below).
- Rooftop deck. See the rooftop section below.
If your deck will sit close to the ground, start with deck builders in Omaha instead.
Second story deck cost and raised deck cost
Fixr says this type needs more support and stairs, so it costs more to build, and Decks.com says more bracing. Below are the dated national figures found, one row per item. HomeAdvisor's page was not re-read, and the Decks.com figure comes from a summary only. None is an Omaha price.
| Item | National range | Source and date |
|---|---|---|
| Two-story deck, per square foot | $30 to $60 | Fixr, updated January 11, 2023; Decks.com, March 1, 2023 |
| Raised deck, per square foot (depends on material) | $25 to $50 | Fixr, updated January 11, 2023 |
| Second-story (raised) deck, per square foot | $40 to $50, average $45 | HomeAdvisor |
| Multi-level deck, per square foot | $30 to $75 | HomeAdvisor |
| Stairs, per stair | $75 to $450 installed (Fixr, materials $25 to $200); $25 to $50 (HomeAdvisor) | Fixr, January 11, 2023; HomeAdvisor |
| Railings, per linear foot | $30 to $210 installed (Fixr, materials $10 to $150); $35 to $210 (HomeAdvisor) | Fixr, January 11, 2023; HomeAdvisor |
| Building permit | Starts at $100 to $500 (Fixr, depending on the area); $230 to $500 (HomeAdvisor) | Fixr, January 11, 2023; HomeAdvisor |
HomeAdvisor figures come from its deck guide as stored on June 17, 2026; the page could not be re-read. The two guides do not agree on stairs, so ask for stairs and railings as their own lines on the quote.
To see how the per-square-foot range works, multiply it. A 200-square-foot deck at $30 to $60 comes to $6,000 to $12,000 before stairs, railings and permit. That is simple arithmetic on the national range, not a price for an Omaha house.
What moves the price
- Height. Fixr says each level you raise the deck increases the support needed and the cost.
- Footings. Omaha's amended code table lists a 42-inch frost line (Ordinance 42104, notice dated 2020; label inferred from the standard IRC order), and footings of an attached deck go below frost depth and Fixr says the two-story type usually has concrete footings, so ask what footing depth and size the plan shows (see the structure section).
- Deck material. Fixr ties the raised-deck range to the material.
- Stairs and landings. Count the steps from the deck to the ground, and ask whether the house needs ground stairs at all.
- Guard system. Guard types vary a lot in price (see the railing range in the table), so pick the type before you compare quotes.
- Under-deck work. Ask for drainage and any ceiling as their own lines.
- Engineering and permit. If the design needs an engineer, ask who pays for the drawing.
- Demolition. If an old deck comes out first, ask whether removal is in the number.
Rooftop deck builders and what a rooftop deck costs
HomeAdvisor's deck guide, as stored on 2026-06-17, gives rooftop decks at $25,000 to $50,000. That page could not be re-read, so treat it as a national figure to confirm with quotes.
Ask any company quoting rooftop deck work:
- Who checked that the roof framing can carry the added weight, and will you see that in writing?
- How does the deck avoid puncturing the roof membrane?
- Where does water go, and who fixes it if it leaks?
- What did the city say about permits for a rooftop deck?
Second story deck builders and elevated deck builders: how to choose
When you look for second story deck builders or elevated deck builders, start with height. Fixr says each level you raise a deck adds support and cost. Here is what to ask.
- Elevated decks they have built. Ask how many second-story decks the company has done and whether you can see finished ones. Treat claims as claims until you have seen the work.
- State contractor registration. The Nebraska Department of Revenue says the Nebraska Contractor Registration Act requires contractors and subcontractors doing business in Nebraska to register, and that a contractor must be registered before performing any construction work. The State of Nebraska's One Stop portal says registration is with the Nebraska Department of Labor. Ask for the company's registration and check it. Also ask the City of Omaha whether it requires its own contractor license for deck work.
- Subcontractors. The Department of Revenue also says a contractor who pays an unregistered subcontractor must withhold 5 percent of the payments and send it to the state. Ask who will do the concrete, framing and electrical work and whether each is registered.
- Insurance. Ask for proof of insurance, and ask your own insurer what it needs to see.
- Who pulls the permit. Ask who applies for the permit and who is on site for inspections. Put it in the contract.
- Who designs it. Ask whether the design is a standard plan or custom, and who draws it.
- Payment schedule. Ask what you pay at signing, at framing and at inspection, and what holds back the last payment.
If one bid is far below the others, ask whether it includes stairs, railings, flashing and the permit.
The structure that keeps an elevated deck up
The ledger is the first thing to ask about
The ledger connection is where the deck attaches to the house. NADRA estimates that 90 percent of deck collapses result from ledger board connection failures (NADRA, January 9, 2025). It adds that most of those failures come from improper fastening, such as nailed-only ledgers.
A quote for a second-story deck should say how the ledger is attached, and what flashing is used behind it.
Sideways movement and bracing
Ask how the design resists sideways movement and which connection detail goes where on your deck.
Bracing has its own logic. The American Wood Council notes that diagonal bracing can add stiffness to a deck and so can cause additional lateral loads on the posts (AWC, September 30, 2021). It adds that center posts carry more vertical load than corner posts, so extra sideways load can overstress them. For center posts, extra bracing can add lateral load. Ask the company which posts get bracing and why.
Posts, footings and the cantilever limit
Omaha adopted the 2018 International Residential Code with local amendments by Ordinance 42104, which took effect July 1, 2020 (City of Omaha ordinance text as published in the Omaha Daily Record, retrieved 2026-10-24). A newer edition may have replaced it, so ask the city which edition applies to your permit. The same ordinance text sets these numbers for Omaha:
- Frost depth: 42 inches. The ordinance adds 42 to Table R301.2(1) with no column headers printed, so the label comes from the standard IRC column order. An attached deck sits on a house, so plan footings below that depth.
- Soil basis: 1,500 pounds per square foot. Omaha's amended R507.3.1 bases deck footings on an allowable soil-bearing pressure of 1,500 psf, with footing size taken from Table R507.3.1.
- Beam cantilever: 24 inches. Omaha's amended R507.5 lets a beam cantilever a maximum of 24 inches unless a professional engineer designs it.
If a beam reaches farther than 24 inches past its last post, the drawing needs an engineer. Make the company show you the post spacing on the plan.
Before any post hole is dug, someone has to call 811. Nebraska 811 says Nebraska law requires anyone who digs to place a locate request at least two full business days before digging, the service is free, and utilities do not mark private lines, so finding those is the owner's job. The Metropolitan Utilities District tells Omaha homeowners the same. Ask who places the request and when.
When the design goes beyond the prescriptive guide
Ask whether Omaha accepts the American Wood Council's DCA 6 guide for common decks. As described in summaries of its scope (AWC, retrieved October 23, 2026; the PDF itself could not be read), it is written for single-level residential wood decks attached to a house. No height limit was confirmed, so ask the company: does your design stay inside the guide, and if not, who draws it?
Stairs, landings and handrails at height
Ask these before you compare quotes:
- Does the house need stairs to the ground, or only a way up to the deck?
- Where do the stairs land, and does the run need a mid-landing?
- Is the handrail continuous along the run, and can you grip it?
- For a walkout, what is the plan for getting out of the basement door if the stairs are blocked?
Stairs are priced per stair, so a tall deck with a long run is a large line on the quote.
Guards and railings on a high deck
NADRA says most codes require a 36-inch-high railing and usually encourage 42-inch-high railings, and that rails should be no more than 4 inches apart (NADRA blog, first posted June 14, 2010). A 2021 IRC explainer on an engineering reference site says a guard is needed where the drop is more than 30 inches measured to the floor or grade below (updated August 7, 2025). Those are model-code figures. Confirm the figures that apply with the city. Ask the company what your deck's drop is. Pick the type early:
- Wood balusters. Ask what upkeep they need.
- Composite or aluminum. Ask what the finish needs over the years.
- Glass or cable. Ask how the posts attach to the deck frame.
The railing range in the table above, $30 to $210 per linear foot installed, shows how far apart these choices are.
Under the deck: drainage, ceilings and lighting
If you plan to use the space under the deck, ask what happens to water that falls through the gaps in the boards. A Decks.com how-to article, as seen in a search summary on October 23, 2026, describes under-deck drainage systems that catch that water and send it to a gutter. Systems that go in above the joists leave room for a finished ceiling. Ask the company which type it plans, where the water leaves, and what it costs as a separate line.
If you want lights or outlets in that ceiling, ask who will wire them and whether a licensed electrician does it. Get the split in writing. Ask the company whether the wiring and fixtures are rated for a wet location.
Omaha snow, weather and timing
The National Weather Service's Omaha/Valley office gives the 1991-2020 normal as 27.1 inches of snow and 31.86 inches of precipitation a year (climate report issued January 1, 2026). Omaha's amended Table R301.2(1) lists a ground snow load of 25 psf (Ordinance 42104; column label from the standard IRC order). Ask the company to show that its post, beam and ledger sizes were chosen for that load, and for a roof over the deck see the covered decks and pergolas page.
Omaha's ordinance also says that where a roofed structure such as a covered deck or porch roof is built without uplift connections, wind uplift calculations prepared by a structural engineer licensed in Nebraska must be provided at the framing inspection. This bears on a roofed deck, so ask whether the design includes uplift connections.
For timing, plan around the permit first. Then add the 811 wait of two full business days, the company's schedule and the inspections.
Permits and inspections in Omaha
Building permits in Omaha go through the City of Omaha Planning Department, whose permit pages are at planning.omaha.gov. The permit threshold for decks, the fee and the plan review time were not found in a readable city source. Ask the city for the Residential Deck Guidelines and the fee page, and the edition of the code that applies. Do not take a company's word that no permit is needed. Check your subdivision's covenants too if it has an association.
Ask the company who pulls the permit, who schedules the inspections, and whether the contract covers fixes if an inspection fails. If you live outside Omaha city limits, ask your own city or county office.
Does a second story deck add resale value?
Decks.com's article (March 1, 2023) says about 65 percent of the cost comes back if an appraiser counts the deck. That is a national figure, not a promise.
Upkeep and safety checks
NADRA says the best way to prevent deck collapse is to keep up with annual deck inspections (NADRA, January 9, 2025). On a high deck, look each year at the ledger and its flashing, at post bases, at loose rail posts and at stair connections. If you see rot, a pulled bolt or a deck that moves when you walk on it, ask a company to look at it. The deck repair page covers that.
A quote checklist for an elevated deck
- Square footage and height above grade, written down.
- Ledger attachment method and flashing.
- How the deck resists sideways movement.
- Post size, bracing and footing depth (Omaha's amended code table lists a 42-inch frost line; label inferred, Ordinance 42104), and any beam cantilever past 24 inches with the engineer's drawing.
- Stairs: number of steps, width, landings and handrail.
- Guard type, height and cost per foot.
- Permit: who applies, the fee, and the inspection steps.
- Drainage or ceiling, if there is space under the deck.
- Whether an engineer's drawing is needed, and who pays for it.
- The company's Nebraska contractor registration, and who the registered subcontractors are.
- Old deck removal, if any.
- Payment schedule, start date and finish date.
How it works with Omaha Deck Builders
Omaha Deck Builders does not build or repair decks. You send the quote form on this page or call, we take your details, and we connect you with an independent local company. The company agrees the price with you and does the work. Ask whether it visits and measures first. Compare bids line by line against the checklist above. You can also reach us on the contact page.
Questions about second story decks in Omaha
How much does a second story deck cost?
Fixr's guide (updated January 11, 2023) gives $30 to $60 per square foot for two-story decks, and Decks.com's 2023 article gives the same range. Those are national numbers. An Omaha quote will list stairs, railings and the permit on top, and footings for an attached deck dug below frost depth, which Omaha's amended code table lists as 42 inches (Ordinance 42104; labels inferred from the standard IRC order).
How does raised deck cost compare with second story deck cost?
Raised decks are priced a bit lower. Fixr gives $25 to $50 per square foot for raised decks, depending on the material, against $30 to $60 for two-story ones. The higher the deck, the more support it needs.
How much do the stairs add?
Fixr puts stairs at $75 to $450 per stair installed. HomeAdvisor, as stored in June 2026, gives $25 to $50. The guides disagree, so ask for a separate stair line.
How much does it cost to build a rooftop deck?
HomeAdvisor's deck guide, as stored on 2026-06-17, gives $25,000 to $50,000. No Omaha rooftop price was found.
How deep do footings go for an Omaha deck, and what snow load applies?
Omaha's amended code lists a 42-inch frost line and a 25 psf ground snow load (Ordinance 42104; column labels inferred from the standard IRC order). Footings are sized on a 1,500 psf soil-bearing basis. A deck not supported by the house is treated differently, so say which kind you have.
Do I need a permit for a second story deck in Omaha?
Omaha's amended building code has deck-specific footing and beam rules (Ordinance 42104). The permit threshold and fee are the one item to confirm in the city's deck guidelines at planning.omaha.gov. Do not start on a company's word that none is needed.
How long does it take to build an elevated deck?
No sourced build time or Omaha review time is stored. What is sourced is the 811 locate: two full business days before digging (Nebraska 811). Add the permit review, the company's own build schedule and the inspections, and ask for a start-to-finish schedule in writing.
Does a second story deck need an engineer?
Omaha's amended code lets a beam cantilever a maximum of 24 inches unless a professional engineer designs it. If the deck has a roof built without uplift connections, Omaha's code asks for wind uplift calculations by a Nebraska structural engineer at the framing inspection. No height rule that triggers an engineer was confirmed, so ask who draws your plan.
Does a second story deck need stairs to the ground?
It depends on the house and the plan. Stairs are priced per stair ($75 to $450 installed per Fixr), so ask whether the design needs them.
Can I put a patio or ceiling under a second story deck?
That depends on your plan. Decks.com describes under-deck drainage systems that send water to a gutter, and some leave room for a finished ceiling. Ask for the drainage as its own line, and ask who wires any lights.
Does the deck company have to be registered in Nebraska?
Generally yes. The Nebraska Department of Revenue says a contractor must be registered in the state database before performing any construction work, and that suppliers and vendors who only provide materials are not required to. Ask to see the company's registration, and ask the City of Omaha whether it requires its own contractor license for deck work.
Sources
- Fixr, deck building cost (updated January 11, 2023; retrieved 2026-10-23)
- HomeAdvisor, build a deck cost (figures as stored 2026-06-17; page not re-read)
- Decks.com, second-story deck cost (dated March 1, 2023; retrieved 2026-10-23)
- Decks.com, under-deck drainage systems (retrieved 2026-10-23, search summary)
- NADRA, build safer decks in 2025 (January 9, 2025; retrieved 2026-10-23)
- NADRA, tips for a beautiful and safe deck (June 14, 2010; retrieved 2026-10-23)
- American Wood Council, DCA 6 diagonal bracing FAQ (September 30, 2021; retrieved 2026-10-23)
- American Wood Council, DCA 6 prescriptive residential wood deck construction guide (scope from search summaries; PDF not readable; retrieved 2026-10-23)
- Engineering Express, IRC railing guidelines (updated August 7, 2025; retrieved 2026-10-23)
- Omaha Daily Record, City of Omaha public notices, Ordinance 42104 text (retrieved 2026-10-24)
- Nebraska Department of Revenue, contractors performing construction services in Nebraska (retrieved 2026-10-24)
- State of Nebraska One Stop, contractor registration (retrieved 2026-10-24)
- National Weather Service Omaha/Valley, annual climate report (issued January 1, 2026; retrieved 2026-10-18)
- Nebraska 811 (retrieved 2026-10-24)
- Metropolitan Utilities District, call 811 before you dig (retrieved 2026-10-18)